Lake Stevens Primed James Hardie Siding With HardiePanel Board-and-Batten Chimneys & Front Gable

This Lake Stevens, WA project was built as a complete exterior case study, not just another list of siding materials. KV Construction approached the work as one exterior system, coordinating the main cladding with the documented preparation, weather protection, transitions, and finish details.

Lake Stevens homes see long wet seasons, so the project paired its profile changes with detailed opening and penetration flashing.

The core installation centered on 8 1/4-inch primed Hardie lap siding with a 7-inch reveal plus HardiePanels and 1×3 battens on chimneys and the front gable. Several project-specific details shaped the scope: vertical HardiePanel accents at the chimneys and front gable created contrast against the broad horizontal lap-siding fields. Together, those choices gave the project a clearer architectural identity while keeping the scope grounded in the actual materials and processes used on site.

Lake Stevens Lake Stevens Primed James Hardie Siding With HardiePanel Board-and-Batten Chimneys & Front Gable by KV Construction
Lake Stevens 8 1/4-inch primed Hardie lap siding at 7-inch reveal exterior detail

Horizontal HardiePlank With Vertical Chimney and Gable Accents

The project started with the preparation that mattered for this specific exterior: old siding and all old window trim removed. That work gave the new siding system the right foundation instead of treating the project as a surface-only update.

Weather Barrier, Flashing, and Rain Control

Pacific Northwest exterior work has to respect water. On this project, the documented supporting system included HardieWrap, seam tape, HardieFlash around windows, doors, and blocks, 26GA flashing, and QUAD MAX. Those layers and transition details help the siding, openings, corners, penetrations, and adjoining surfaces work together through the region’s long wet season.

Material Choices That Fit the Project

The main exterior choice was 8 1/4-inch primed Hardie lap siding with a 7-inch reveal plus HardiePanels and 1×3 battens on chimneys and the front gable. KV Construction paired that with 4×4 outside corners, front bay-window and garage trim, with white top flashing on side and rear windows. The profile, spacing, texture, trim depth, and color or finish all influence how the building reads from the street, while the supporting details protect the edges where materials meet.

Details That Made This Project More Complete

Several project details made this scope more complete: Vertical HardiePanel accents at the chimneys and front gable created contrast against the broad horizontal lap-siding fields. These items are important because siding projects often become most complex at soffits, openings, rooflines, lower-wall transitions, gutters, or places where two materials and profiles meet.

Outcome and Property Owner Value

The finished scope gives the property a more coordinated exterior, with the visible siding and the supporting details tied into one project. It is the kind of work KV Construction wants to be known for: practical, well-organized, and built around durable siding systems suited to Pacific Northwest weather.

Facebook
Email
Pinterest

Project Specifications And Materials

  • Area: Lake Stevens, WA
  • Type: Full primed James Hardie siding replacement
  • Siding: 8 1/4-inch primed Hardie lap siding with a 7-inch reveal plus HardiePanels and 1x3 battens on chimneys and the front gable
  • Weather Barrier / Flashing: HardieWrap, seam tape, HardieFlash around windows, doors, and blocks, 26GA flashing, and QUAD MAX
  • Trim / Metal Details: 4x4 outside corners, front bay-window and garage trim, with white top flashing on side and rear windows
  • Repairs / Prep: Old siding and all old window trim removed
  • Additional Scope: Vertical HardiePanel accents at the chimneys and front gable created contrast against the broad horizontal lap-siding fields
  • Sealant: QUAD MAX caulking application where specified

Request a Free Siding Consultation

Talk with KV Construction about a full siding replacement, James Hardie exterior upgrade, or larger moisture-related siding project built for Pacific Northwest weather. KV Construction is owner-operated, uses consistent crews, follows disciplined flashing and QUAD MAX sealant standards, and backs its work with a 5-Year KV Workmanship Warranty. Request a free siding consultation to review your exterior, materials, waterproofing details, and project fit.

PNW rain-ready wall system on Lake Stevens project
KV Construction siding installation process in Lake Stevens