This Marysville project replaced existing cedar shingle siding with James Hardie Cedarmill ColorPlus shingles. KV Construction removed the old cedar shingles, installed HardieWrap, then completed the documented shingle siding and QUAD MAX caulking.
The documented scope calls for tear-off of the old cedar shingle siding.
HardieWrap paper was installed before the new shingles. It provides the specified weather-resistive layer behind the finished cladding for Marysville rain exposure.
The replacement is factory-finished Cedarmill James Hardie ColorPlus shingle siding.
This CASE documents natural cedar shingles replaced with factory-finished fiber cement shingles. The project demonstrates how specific exterior materials, opening details, siding profiles, and finishes can be coordinated with the rainy conditions common around Marysville. KV Construction uses owner-managed project oversight and a consistent crew approach on its larger siding and exterior work.
If your Marysville property needs a complete siding replacement or a larger James Hardie exterior project, request a free siding consultation with KV Construction. Discuss the existing wall conditions, appropriate cladding, moisture-management details, and the practical scope before work begins.